Opening Preparations – Lamps

The space is now looking more like a craft club

The walls and ceiling have been painted white. We are trying different setups with the tables. One sewing machine is now visible. -And it feels like we already have too much stuff and we haven’t even opened yet.

Lamps and textile covered cables

I’m at this minute working on how the lamps shall be set up around the felting tables. It will hopefully be a lot of textile covered cables and a lot of white paper lamps. I might even attend a woodwork workshop in order to make something to arrange the cables that looks a bit better than a plastic cap.

 

Designed and managed by Atelier partnership